Sycamore Square Group were appointed to design and project manage the replacement glazing to the Richmond Link Building. We liaised directly with the local supply chain to develop the specification and design that provide the most thermal efficient performance whilst providing the required ventilation and emergency escape provisions. The works were undertaken in a live campus environment and we worked closely with the Universities Health and Safety team to ensure access, egress, segregation, storage and installation of the windows was undertaken with the highest regard for health and safety. We coordinated the asbestos surveys to ensure that any potential hidden packers or materials were identified in advance of the works. The windows all underwent suitable testing and certification and were installed to a high quality standard on time and on budget.