Sycamore Square Group provided the role of Lead Consultant, and Building Surveyor to assess the gable ends of a multilet office building which was overclad with an insulated render system back in 2002, due to the risk associated with a number of recent failures of the cladding at low level in the last 10 years. We undertook a detailed drone survey of the building and in collaboration with our specialist Structural Engineers, we undertook a number of assessments of the building to come up with several temporary options for the client in how to risk could be mitigated in the short term, without having to replace the cladding in its entirety. A preferred temporary option was designed and developed and the solution installed by a specialist rope access company, during which we carried out a number of site inspections and quality control visits to make sure the works were being carried out in accordance with the design parameters and signed off accordingly.