No items found.
All projects

Leeds Conservatoire Glazing Replacement

Category
Education

Project overview

Sycamore Square Group were appointed to provide Principal Contractor, CDM and BSA Principal Designerservices for a glazing replacement scheme at Leeds Conservatoire College, for Luminate Education Group.The building remained live throughout the duration of the works, and we therefore worked extensively with our supply chain and specialist subcontractors to carry out detail surveys and phasing plans of the areas required, so that we could develop a detailed programme of work which we phased with the college to make sure that there was minimal disruption to the day to day operations of the college. The project was delivered on time and within budget, with no issues or concerns raised by the college during the works.

Our Services

  • Principal Contractor
  • BSA Principal Designer
  • CDM Principal Designer
  • Temporary Works Coordinator
  • Temporary Works Supervisor
  • Health and Safety Advisors
Sycamore Square Group provide innovation and creative solutions to overcome potential project issues, and maximise value for money.
Get in touch